Play Open
SDE Group Please wait SDE Group Please wait SDE Group Please wait SDE Group Please wait SDE Group Please wait SDE Group Please wait
SDE Group_White
Electrical

Gridserve Dobbies Speke

  • Client Gridserve
  • Date October 2023
  • Sector Electrical
  • Location Speke

SDE Electrical worked closely with Gridserve to carry out a feasibility study into installing a new bay of 8 high powered ABB car chargers with Dobbies Speke. This was all powered from a new Sub Station installed by ourselves and the SDE Group.

Our electrical services included:
- Installation
- Servicing
- Test and inspection

This was all powered from a new  Sub Station installed by ourselves and the SDE Group:

4 x 4  ABB 184 High powered Car charger posts
4 x 4 ABB 175 High Powered Car Charger posts

-Install 185mm HO7 cables to each of the 8  Charger 175kw Power Cabinets
- Install 185mm HO7 Cables from Cabinets to Charger posts
- Install Data Cat 6 and Fibre Optic cables to each Charger post
- Fit install and Connect  LV , Comms and Scarda Panel
- Fit, Install, Connect and Carry out Electrical Tests on all Cables and Car Chargers.
- Commission of All the Car Chargers

Related projects

You may also be interested
in these projects

Lorem ipsum dolor sit amet, consectetur adipisicing. Perspiciatis ipsum vero optio rerum molestiae, sintory ducimus, rem labore et delectus aspernatur.

Lets get your project started.

Enquire with out team of experts about how we can help you with your next project.

Contact Us

+44 (0)1246 827722

© 2024 SDE Group. All Rights Reserved.

Developed by: SDE Group