Gridserve Lincoln involved was to working closely with Gridserve to carry out a feasibility study into installing a new Bay of 6 High powered ABB Car Chargers within the Car Park adjacent to Aldi. This was all powered from a new Sub Station installed by ourselves and SDE Electrical: - Free Standing 2500Amp Feeder Pillar - 6 x ABB 184 High powered Car charger posts
Install 185mm HO7 Cables from LV Feeder Pillar to ABB184 Charger posts
- Install Cat 6 Data cables between Scada Comms Cabinet and each Charger post. - Install 4Core SWA Cable between Scada Comms Cabinet and Charger posts for Tilt Sensors. - Fit, install and Connect HP LV Feeder Pillar and Scada Comms Panel - Fit, Install, Connect and Carry out Electrical Tests on all Cables and Car Chargers. - Commission of All the Car Chargers
Related projects
You may also be interested in these projects
Lorem ipsum dolor sit amet, consectetur adipisicing. Perspiciatis ipsum vero optio rerum molestiae, sintory ducimus, rem labore et delectus aspernatur.