Additionally, one of the key challenges facing such a large organisation such as CEF with over 300 branches across the UK, is areas for stakeholder both internally and externally to stage meetings and showcase their products and services. Therefore, SDE Group worked in conjunction with CEF to design a modern 'Showroom / Social space', designed wow it's audience before even stepping foot into it's warehouse and operations.
The services included:
- Two-tier mezzanine floor
- Over 1000 bulk storage pallet spaces
- Nearly 200 cable drum storage facilities, capable of taking up to 5 tonnes, a first revolutionary process for CEF
- Containment and stillage storage of up to 3600mm length
- Over 100 bays of small-item storage and picking bays
- Electrical and interior fit-out of multiple offices, meeting rooms, canteens, receptions, toilets and a modern meeting space
- Spatial planning, 3D modelling and visualisations prior to any works starting