Client:
TrustFord
Date:
February 2024
Location:
Aberdeen
Sector:
Car Showroom / Automotive Solutions

Overview

SDE Electrical was appointed to deliver the full internal electrical fit-out for a newly developed Parts Plus in Tamworth. The project encompassed the technical design, coordination, and installation of a complete electrical system tailored to the operational needs of a modern distribution facility:

Containment Systems:

Design and installation of new containment routes throughout the facility, ensuring safe and accessible cable management.

Lighting:

Installation of energy-efficient LED lighting with PIR motion sensors and daylight controls, ensuring compliance with CIBSE lighting guidelines while reducing long-term energy costs.

Small Power Systems:

New circuits were installed to support:
– General power sockets
– Electrical heating
– Data cabinets and comms equipment
– Fire and intruder alarms
– CCTV
– Mechanical ventilation and air conditioning systems

Fire Alarm System:

A new Category L1 open protocol fire alarm system was installed, offering maximum life safety coverage and flexibility for future maintenance and expansion.

This project demonstrates SDE Group’s ability to deliver high-spec, operationally efficient industrial spaces tailored to complex client requirements. From structural engineering to compliance, logistics, and interior fit-out, every element of the Parts Plus Tamworth Hub was executed with precision and a focus on long-term usability.

This project is also a further example of SDE Electrical’s ability to deliver high-quality M&E services to the industrial and distribution sectors, with a focus on performance, safety, and energy efficiency.