SDE Electrical, in collaboration with the SDE Group, was engaged by Gridserve to deliver a full-service EV charging installation adjacent to Aldi in Lincoln. This project involved early-stage feasibility planning, full design development, and complete installation of a new ultra-rapid charging bay featuring six ABB 184kW chargers.
The system is powered by a newly installed Sub Station and a 2500A free-standing LV feeder pillar, both supplied and installed by SDE Electrical and SDE Group. The site now offers a robust, high-capacity charging solution to support the growing demand for electric vehicles in the region.
Scope of Works Delivered
SDE Electrical was responsible for the end-to-end delivery of the electrical infrastructure, covering:
Design & Installation:
– Engineering and installation of a 2500Amp feeder pillar to support six high-powered chargers
– Supply and installation of 6 × ABB 184kW EV charging posts
– Laying and terminating 185mm² HO7 cabling from the LV feeder pillar to each charger cabinet
Data & Control Systems:
– Installation of Cat 6 data cabling between each charger post and the SCADA comms cabinet
– Installation of 4-core SWA cabling for tilt sensor connections between the comms cabinet and each charger
– Full installation and connection of the SCADA communications panel, enabling remote monitoring and control
Testing & Commissioning:
– Electrical testing and inspection of all installed cables, equipment, and interface
– Final commissioning of all six ABB car chargers, ensuring full functionality and compliance with Gridserve’s performance standards