As part of the fit-out, we provided the client with a brand new Reception with a bespoke “curved” counter with remote access control, which after much trial and tribulation we arrived at the template which is to be used in CFC’s and branches for the future. The interior-fit out also included a managers’ office, kitchen/breakout area and large boardroom.
As previously mentioned, the ultimate goal of the project was to expand the storage capacity of the local branches, so our industrial fitters extended an existing two-tier concrete mezzanine which would store approximately 2000 totes boxes, nearly 80 cable drums, 70 stillages and over 600 pallet spaces, as well as other general storage areas for containment products, LED batons which must be stored horizontally and specific customer orders.